Imprint

Facade Roof Interiour Applications Design Series Refurbishment
______________________________


Home News Press Profile Careers

RODECA News

 
London Design Festival 2008

This outstanding bar with up to 15m long panels was the centre piece for the 100%Detail exhibition during the London Design Festival 2008. Build in only three days with more than 400m2 of rodeca panels applied this pavillion shows the possibilities of modern construction materials under a challenging time schedule while still meeting highest aesthetic demands and budget of a temporary build.

Designer: Tom Dixon Studio
Structure: Modul
Organiser: Reed

 

 





 
       
Back

 

rodeca Transparente Bauelemente

Contact Newsletter Downloads RODECA Principle